Loading volume, M3: 33 drying time (deciduous), days: 13 heat treatment time, days: 2 performance (drying), m3/month: 10 performance (thermo), m3/month: 50 heater: natural gas/propane thermal power, KW: 20 Electric power, kW: 0.75 The cost of drying, rub/m3: 800 Thermo costs, rub/m3: 300 stack length, m: 5 chambers (d*sh*c): 6000*2000*2000